DP World: Doraleh Container Terminal Concession Is Still in Force(marine crane manufacturer;offshore crane manufacturer)

- Jul 13, 2018-

DP World warned that the government’s “illegal seizure” of the terminal doesn’t give the right to any third party to violate the terms of the concession agreement.

The statement comes in the wake of news reports on the opening of the first phase of the Chinese-built International Free Trade Zone. This is said to be in violation of DP World’s exclusive management rights.

“This is yet another clear example by the Djiboutian Government of violating its contractual obligations and the rights of foreign investors,” a DP World spokesperson said.

In February 2018, the Government of Djibouti seized control of the terminal, forcing DP World employees to leave the country and terminating the concession agreement.

DP World commenced an arbitration against Djibouti before the London Court of International Arbitration and is awaiting the outcome of this process.(marine crane manufacturer;offshore crane manufacturer)




The WOOD GRAB has been designed for load handling in the forestry industry. They can be attached to all standard excavators.

The WOOD GRAB is characterized by a robust design and construction, high bundling capacity and optimized claw geometry. The two equalizing bars ensure that the closing behavior is uniform.

The Wood Grab are equipped with a hydraulic rotary drive which offers 360° continuous rotation and features integrated pressure limitation. This enables accurate positioning of the attachment.(marine crane manufacturer;offshore crane manufacturer)